Port Macquarie Southern Breakwall Repair
Project overview
The NSW Government is delivering major improvements to maritime infrastructure and facilities statewide, to help the boating and wider community safely access, use and navigate our inland and coastal waters.
Latest news
December 2023 - critical repair work on the Port Macquarie Southern Breakwall
Transport for NSW is committed to delivering critical repair work on the Port Macquarie Southern Breakwall.
Ongoing issues in getting access to the site for construction have resulted in a delay in our plans to publish the redesign of the project and issue a tender for the work.
As we have not yet been able to issue the tender, we do not anticipate construction will commence before mid-2024.
Transport for NSW is continuing to work with businesses and stakeholders in the area to resolve these issues.
We will keep the community updated with our progress.
Project information
Background
The Port Macquarie breakwalls were installed to provide a safe navigable boat entrance and maintain the current river mouth entrance.
The Port Macquarie breakwall was built over a period of 40 years with completion in 1939. The last major maintenance was carried out on the head of the breakwall in 2014.
As part of the project early investigations, including underwater assessments and scans shows the southern breakwall is in need of extensive repair works. The rock has settled and shifted over time, creating voids which compromise the effectiveness and stability of the structure.
About the project
The NSW Government is funding a proposal to repair the southern breakwall at Port Macquarie. We have developed a refined concept design which includes:
- repairing 600 metres of the breakwall along the river section
- completing maintenance of the breakwall head with minimal change to the footprint
- installing a new five-metre-wide footpath along the majority of the structure’s length. This excludes the last 30 metres at the head of the breakwall, where the current footprint and width will stay the same.
- Installing two new stair accesses to the NRMA Holiday Park, and a new access ramp at the seaward end of the Holiday Park
- Installing safety fencing along the southern side of path and a kerb along the northern side of the path
- Installing new lighting on the shared user path
- Installing new seating areas and accessible viewing platforms
- Landscaping the area with over 6000 plants and 43 mature replacement trees.
An updated concept design will be available on the project website soon.
What's happening now?
Following release of the Submissions Report in November, and the re-submission of the finalised Review of Environmental Factors and project plans, Transport for NSW has obtained approval to proceed with the Port Macquarie Southern Breakwall Repair project.
In May 2023, the project advised that there were not successful tenders for the construction of the project and would review the project design.
Transport for NSW has completed our review of the project design which we will publish shortly.
Once we have a date for going back out to tender, we will update our project website.
Next steps
- Award the tender for the work
- Start construction
Transport for NSW acknowledges the significance of the painted rocks along the southern breakwall to the Port Macquarie community. To preserve this part of the community’s history as much as possible, we have created a virtual gallery, and invite you to virtually walk this vibrant trail - explore and download images of your favourites here.
Community information
Fact sheets
Frequently asked questions (FAQs)
Community updates
Project documents
Some documents on this page may not comply with accessibility requirements (WCAG). If you are having trouble accessing information in these documents, please contact us.
Project notifications
Reports
- [Published: Nov 2022] November 2022 Review of Environmental Factors (PDF, 26.53 MB)
- [Published: Nov 2022] Submissions Report (PDF, 3.46 MB)
- [Published: Oct 2022] Landscaping plan (PDF, 3.22 MB)
- [Published: Oct 2022] Tree Impact Assessment (PDF, 3.67 MB)
- [Published: Oct 2022 – NO LONGER APPLICABLE] Design Report (PDF, 3.53 MB)
- [Published: Oct 2022 – NO LONGER APPLICABLE] Updated Drawings (PDF, 17.1 MB)
- [Published: Jun 2022 – SUPERSEDED] Environmental Assessment (PDF, 63.49 MB)
- [Published: Nov 2022 – NO LONGER APPLICABLE] 3D Artists Impression (PDF, 2.7 MB)
- [Published: Nov 2022] Basis of design report (PDF, 12.24 MB)
- [Published: Nov 2022] Geotech report (PDF, 25.96 MB)
- [Published: Apr 2021] Post flood report (PDF, 1.9 MB)
Contact us
For more information contact the project team:
Phone: 1800 571 311